In remote regions of Oman, projects often struggle with limited infrastructure, unstable power supply, and high operating costs. To meet these challenges, GS Housing developed a 56-unit modular office and labor accommodation camp that operates independently with a full solar power system. This off-grid solution has become a benchmark for sustainable and efficient flat-pack container construction in the Middle East.
1. Project Overview
Location: Oman
Scale: 56 flat-pack houses
Functions: Container Office building + modular accommodation units + portable sanitation modules
Key Feature: Solar-powered temporary workforce accommodation camp operating 24/7 without municipal electricity
This labor camp project was specifically designed for remote work sites where quick deployment, stable power, and high comfort are essential.
![]() |
![]() |
2. Solar Power System: Core Advantage of the Office Area
The prefab office building is equipped with high-efficiency solar panels and battery storage, enabling the entire office area to run independently.
✔ 24/7 Office Power Supply
The system uses solar energy to power air conditioning, lighting, computers, and office equipment during the day; at night, it is continuously powered by energy storage batteries to ensure stable equipment operation.
✔ No Grid Connection Required
Solve the problem of “difficult and costly power access” in remote areas, truly achieving “build and use immediately.”
✔ Energy Saving and Low Operating Costs
The solar system significantly reduces the use of diesel generators, reducing fuel consumption and maintenance costs at the source.
✔ Environmentally Friendly
Reduces carbon emissions, aligning with the policy requirements for sustainable projects in Oman and the Middle East.
This makes it ideal for desert modular camps, Oman construction site bunkhouses, and remote mine camp locations.
![]() |
![]() |
3. Modular Design for Office and Accommodation
Designed for harsh climates in Oman and the Gulf region:
Double-layer steel panels with high-density rock wool insulation
Temperature-resistant roofing structure
Efficient AC configuration
Independent toilet and shower modules
The worker accommodation camp provides a comfortable, safe, and stable living environment even during Oman’s 45°C summer heat.
4. Fast Installation and High Mobility
Portacabins are fully preassembled in the factory and only require simple on-site installation.
Benefits include:
60% shorter construction period
Minimal on-site disturbance
Easy relocation, reuse, and expansion
This greatly improves project efficiency for contractors working in remote Omani regions.
![]() |
![]() |
5. Sustainability and Cost Efficiency
The solar-powered flat-pack camp demonstrates the value of combining modular construction with renewable energy:
Lower long-term electricity cost
Reduced diesel generator dependence
Eco-friendly operation
Long service life and repeatable use
For companies operating in Oman, the UAE, Saudi Arabia, and Qatar, this model offers a sustainable and scalable solution for workforce accommodation.
6. Why Choose GS Housing for Solar-Ready Modular Container Camps?
GS Housing provides:
Large-scale temporary workforce housing production capacity
Fire-proof insulation suitable for Middle Eastern climates
Integrated solar system design
Flexible off-site camp housing planning (office, accommodation, dining, storage, medical units)
International installation support
This Oman flatpack container camp project reflects the company’s capability in delivering energy-efficient modular construction camps worldwide.
The Oman 56-unit flatpack staff camp showcases how modular buildings and solar power can deliver reliable, sustainable, and cost-effective solutions in remote desert environments. With its off-grid operation capability and comfortable living standards, this project sets a new standard for solar-powered modular workforce camps across the Middle East.
![]() |
![]() |
Post time: 17-12-25