Located within the core construction area of the Xiongan New Area Start-up Zone, the Utility Tunnel Project 03, as a key urban underground infrastructure project, places higher demands on the standardization, efficiency, and safety management of the construction site.
To meet the on-site office and personnel accommodation needs during the project construction period, this project includes the construction of 250 detachable prefab houses, creating a high-standard modular construction camp.
As a prefab building solutions provider, GS Housing offers professional and systematic prefab containers products and prefab camp solutions for such large-scale infrastructure projects.
I. Project Overview
Project Name: Xiong'an New Area Start-up Zone Utility Tunnel Section 03 Prefab Camp Building
Product Type: Detachable Prefab House
Quantity: 250 sets
Application Functions:
Worker Dormitory
Project Office Area
Meeting Room
Public Supporting Facilities
This project site camp adopts a modular combined-structure design with a scientifically zoned overall layout, meeting the standards for civilized construction management in modern large-scale municipal engineering projects.
II. Core Advantages of GS Housing Prefabricated Houses
1. Standardized Modular Design
GS Housing prefabricated houses adopt a unified, standardized production system, with all components prefabricated in the factory:
✔Hot-dip galvanized steel structure frame
✔Insulated wall panel system
✔Integrated doors, windows, and electrical systems
✔Waterproof roof structure
On-site installation only requires hoisting and assembly for immediate use, significantly shortening the construction cycle.
2. High-strength Steel Structure System
The mainframe uses a high-strength galvanized steel structure, possessing
✔ Strong wind resistance
✔ Class 8 seismic performance
✔ Three-layer stacking ensures safety and stability
✔ Can be repeatedly disassembled and reused
Especially suitable for the long-term and phased use needs of large-scale infrastructure projects.
3. Rapid Installation & Rapid Delivery
250 prefabricated modular units, produced through standardized manufacturing and large-scale transportation, achieve the following:
✔Bulk Delivery
✔Rapid On-site Assembly
✔Modular Combination and Expansion
Compared to traditional temporary construction methods, construction efficiency is significantly improved, greatly meeting the high-paced construction needs of Xiong'an New Area.
4. Flexible Combination & Overall Camp Planning Capabilities
GS Housing provides not only individual prefabricated container products but also
✔Overall Prefabricated Camp Planning and Design
✔Site Office and Living Area Zoning Solutions
✔Multi-story Stacked Building Design
✔Supporting Staircase and Corridor Systems
Achieving a truly comprehensive "standardized construction camp solution."
III. Applicable Engineering Fields
This product model is widely applicable to:
Urban Integrated Utility Tunnel Projects
Highway and Railway Construction
Energy and Power Projects
Oil and Gas Projects
Large-Scale EPC General Contracting Projects
Overseas Infrastructure Camp Projects
GS Housing has mature application experience in both domestic and international infrastructure construction camps.
V. Project Value Demonstration
As a national-level demonstration project, Xiong'an New Area's construction camp construction standards represent the level of modern infrastructure management in China. The 250-unit flat-pack container house project fully embodies the following:
Standardized construction concept
High-efficiency engineering support
Safe and reliable temporary facility system
Mature application of modular buildings in large-scale municipal engineering projects
VI. GS Housing — China's Leading Prefab Container House Solution Provider
GS Housing focuses on:
Flat Pack Container House
Modular Worker Camp
Container Office
Temporary Construction Camp
We are committed to providing high-quality modular building products for global infrastructure construction, particularly suitable for mining, oil&gas, emergency housing after diaster, reconstruction building etc.
Post time: 05-03-26



