CE Certification Prefab House Quotes – Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing

Short Description:


porta cbin (3)
porta cbin (1)
porta cbin (2)
porta cbin (3)
porta cbin (4)

Product Detail

Product Tags

Related Video

Feedback (2)

Sticking for the belief of "Creating items of top of the range and creating buddies with people today from all over the world", we normally put the interest of shoppers in the first place for Portal Framed Buildings, Container House Project, Two Storey Container House, Normally to the majority of business users and traders to offer best quality goods and excellent company. Warmly welcome to join us, let's innovation collectively, to flying dream.
CE Certification Prefab House Quotes – Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing Detail:

Two Floor Prefabricated Labor Mining Camp Container House Modular House Video

The mining camp consists of 1605 sets flat packed container houses, prefab houses, detachable houses, include 1095 sets 6055*2990*2896 mm ( 3 meter width ) standard multi functional flat packed container houses, 3 sets 3 meter (width) guard modular houses, 428 sets 2.4 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, and 3 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, 38 sets stair kind flat packed container houses and 41 sets walkway container houses.

The mining camp were shipped into two batch, the first batch (524 sets) flat packed container houses. After Indionesia cusomter received the first batch container houses and checked the houses quality, they continued to book the second batch from us: 1081 sets flat packed container house, and these modular houses had been deliveried to our customer on time.

Two Floor Prefabricated Labor Mining Camp Container House Modular House2

The two floor prefabricated labor mining camp container house modular house were on installation by local worker.

Mining camp accommodation (6)

Installation Video of GS Housing Prefabricated Camp

For the oversea projects, in order to help the contractor save the cost and install the houses ASAP, the installation instructors will go abroad to guide the installation on site, or guide via online-video. in addition, the multi-types installation guides will be sent you to solve various problems.

Standard flat packed container house structure

The flat packed container house consists of upper frame components, bottom frame components, column and several interchangeable wall plates,and there’re 24 sets 8.8 class M12 high-strength bolts connect the upper frame & columns, column&bottom frame to form an integral frame structure, ensures the stability of the structure.

Two Floor Prefabricated Labor Mining Camp Container House Modular House

The product can be used alone, or form a spacious space through different combinations of horizontal and vertical directions. The house structure adopts the cold-formed galvanized steel, the enclosure and thermal insulation materials are all non combustible materials, and the water, heating, electrical, decoration and supporting functions are all prefabricated in the factory. No secondary construction is required, and it can be checked in after on-site assembly.

Two Floor Prefabricated Labor Mining Camp Container House Modular House

GS Housing Prefab House Production Bases

GS Housing’s five production bases have a comprehensive annual production capacity of more than 170,000 houses,the strong comprehensive production and operation capabilities provide a solid backing for houses production.


Product detail pictures:

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures


Related Product Guide:

Our intention should be to fulfill our consumers by offering golden provider, superior price and superior quality for CE Certification Prefab House Quotes – Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing , The product will supply to all over the world, such as: Jeddah, Amsterdam, Ottawa, Our factory is equipped with complete facility in 10000 square meters, which makes us be able to satisfy the producing and sales for most auto part products. Our advantage is full category, high quality and competitive price! Based on that, our products win a high admiration both at home and abroad.
  • The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Edith from El Salvador - 2017.10.13 10:47
    The company keeps to the operation concept "scientific management, high quality and efficiency primacy, customer supreme", we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Elaine from Luxembourg - 2018.02.21 12:14